PT
ENG
PROJECTS
During the course of Maquinter of Portugal; participated in several projects as equipment suppliers
and technical solutions; within a framework of action that became operational cuts across
marketing equipment; parts supply; operator training and maintenance contracts and assistance.
Due to the volume of investment of the work; the same importance for the development of the
country; set of equipment provided by us and men in work and applied technology; we mentioned
some projects where Maquinter of Portugal had a structural importance in their participation.
1.
2.
3.
4.
5.
6.
7.
8.
Concrete Design - Loureiro Project , Alvito , irrigation Channels
9.
Concrete Design - Oporto Underground - Bolhão Station
10.
11.
12.
13. Dam Foz Tua
14. Dam Ribeiradio - Ermidio
15. Dam Baixo Sabor
16. Step Pumping Station, Abu Dhabi, United Arab Emirates;
17. Projects Simtejo
18. End Odivelas Station – Yelow line Lisbon Underground
19. Baixa-Chiado Station - Blue Line Lisbon Subway
20. Alqueva Dam
21. Panasqueira Mine
22. Extension of the Red Line – Alameda- Olaias
23.Rossio Tunnel
Power Boost - Dam Picote
Extension of the Red Line of the Lisbon Underground - East- Airport
Concrete Design - Morocco, SMI, Silver Mine.
Fans Main (Somincor Mine)
Fans Main (Almina Mine)
Herrenknecht tunnel boring machine of the tradition from Marques de Pombal Station -
Oporto Subway.
Concrete Design - Perfect Poplar
Boost Power Venda Nova II
Boost Power Venda Nova III
Extension of the red line of the Lisbon Underground São Sebastião - Alameda
Maquinter of LDA Portugal © 2015 - 2021. All Rights Reserved. Managed by: Diginfor Lda.